Estimating Sheets

 

Civil Engineering : Concrete Technology Interview Questions

 

 
  1. For quality control of Portland cement, the test essentially done is

  2.  

  3. If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,

  4.  

  5. Under normal conditions using an ordinary cement, the period of removal of the form work, is :

  6. For given water content, workability decreases if the concrete aggregates contain an excess of

  7. The mixture of different ingredients of cement, is burnt at

  8.  

    Click the button below to submit your answers and check your accuracy level

 

 

Civil Engineering : Concrete Technology Interview Questions
Image Courtesy: amconstruction.us


 

Estimating Softwares

Takeoff Tools

 
DISCLAIMER: "Autodesk, AutoCAD, Revit, Navisworks, Ecotect, QTO, DWG, 3ds Max, are registered trademarks or trademarks of Autodesk, Inc. All other brand names, product names, or trademarks belong to their respective holders. © 2010 Autodesk, Inc. All rights reserved.
HOME | SERVICES | SHEETS | DIRECTORY | CONTACT | ABOUT US | PRESS RELEASES | EVENTS | ADVERTISING

Site Design & Develop by

Global Associates

Join Our Email List