Engineers are always looking for excellence in construction. But they have to follow some basics before starting the mega project.

 

The site engineers generally concentrate much on those issues:

 

  • Bars which have the diameter more than 36 mm should avoid lapping.
  • The maximum chair spacing is 1.00 m (or) 1 No per 1m2.
  • Minimum 12 mm diameter needed for dowel rod.
  • 12 mm diameter bar should be used in chair.
  • The longitudinal reinforcement should follow the range between 0.8 - 6 per cent of gross CS.
  • For circular column, bars would be 4 Nos and 6 Nos.
  • Slabs are important in any construction. The main bar slab (8 mm HYSD) or 10mm (plane bar), distributor should not be less than 8 mm and more than 1/8th of slab's thickness.
  • 125 mm is minimum slab thickness.

 

 
  • Concrete free fall maximum maximum 1.50 m.
  • Remember lap slice should not be used in the bar larger than 36 mm.
  • Brick water absorption should not be 15 per cent.
  • PH value of water has to be 6.
  • Brick compressive strength 3.5 N / mm2.
  • 8 kg per MT is the measurement of steel reinforcement binding wire.
  • Samples for ore cutting test in the soils filling for every 100m2.

 

Density of Materials:

Bricks: 1600 - 1920 kg/m3
Concrete block: 1920 kg/ m3
Reinforced concrete: 2310 - 2700 kg/ m3

 

Cube samples required for different quantity of concrete:

 

Quantity of Concrete

No. of cubes required

1 - 5 m3

1 No's

6 0 15 m3

2 No's

16 - 30 m3

3 No's

31 - 50 m3

4 No's

Above 50 m3

4 + 1 No's of addition of each 50 m3

 

Curing time of RCC Members for different types of cement - Super Sulphate cement: 7 days, Ordinary Portland cement OPC: 10 days and Minerals & Admixture added cement: 14 days.

 

Some important tips for Civil Site Engineering

 

De-Shuttering time of different RCC Members:

RCC Member

De-shuttering time

For columns, walls, vertical form works

16-24 hrs.

Soffit formwork to slabs

3 days (props to be refixed after removal)

Soffit to beams props

7 days (props to refixed after removal)

Beams spanning upto 4.5m

7 days

Beams spanning over 4.5m

14 days

Arches spanning up to 6m

14 days

Arches spanning over 6m

21 days

Read More: theconstructor.org/tips

 



 

Submit Article  NEW

Estimating Softwares

Takeoff Tools

 
DISCLAIMER: "Autodesk, AutoCAD, Revit, Navisworks, Ecotect, QTO, DWG, 3ds Max, are registered trademarks or trademarks of Autodesk, Inc. All other brand names, product names, or trademarks belong to their respective holders. © 2010 Autodesk, Inc. All rights reserved.
HOME | SERVICES | SHEETS | DIRECTORY | CONTACT | STUDY | ABOUT US | PRESS RELEASES | EVENTS | ADVERTISING

Site Design & Develop by

Global Associates

Join Our Email List