Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; FGContactForm has a deprecated constructor in /home/flippa123/public_html/quantity-takeoff.com/include/fgcontactform.php on line 18
brickwork takeoff sheet | brickwork estimation | take off sheet

Estimating Sheets

 

Download Brickwork takeoff sheet for brickwork estimation

Home » Quantity-take-off Sheets

 

 

Brickwork takeoff sheet is a useful sheet for brickwork calculation. This estimating spreadsheet will provide the quantities of materials required for any brickwall based project (masonry work etc.)

 

With this estimating spreadsheet, one will be able to estimate basic dimensions, areas and volume. Brickwall takeoff sheet will help you to determine the perfect quantities and details of quantity of materials.

 

The spreadsheet provide you the information for Total Bricks laid, Total Bricks required, Total Sills Laid, Total L/M Issolated Piers, Total Window & Door M2, Total Sand Required, Total Cement Req. 20kg bag, Total Limil Req. 20kg bag.

 

     

    Download Brickwork takeoff sheet for brickwork estimation

     

    Brickwork takeoff sheet


 

Estimating Softwares

Takeoff Tools

 
DISCLAIMER: "Autodesk, AutoCAD, Revit, Navisworks, Ecotect, QTO, DWG, 3ds Max, are registered trademarks or trademarks of Autodesk, Inc. All other brand names, product names, or trademarks belong to their respective holders. © 2010 Autodesk, Inc. All rights reserved.
HOME | SERVICES | SHEETS | DIRECTORY | CONTACT | ABOUT US | PRESS RELEASES | EVENTS | ADVERTISING

Site Design & Develop by

Global Associates

Join Our Email List


Download Form
* required fields




Thanks a lot!

 

Download Brickwork takeoff sheet in Excel