Lime concrete is a composite mixture of lime as restricting material, sand as fine aggregate, and rock as coarse aggregate in proper extents. Lime concrete mix proportion relies upon the sort of development, however all in all, it tends to be taken up to a 1:2:3 proportion for lime, sand, and coarse aggregate, individually.

Lime concrete had wide applications in development before the pattern of utilizing concrete as restricting material got pervasive. These days, lime concrete is additionally utilized as a narrow break by laying it on the protection base, which is fume penetrable.

In this article, we will talk about the proportioning, mixing, putting, and curing of lime concrete.

Lime can be arranged into two sorts:

1. Class A ? Eminently water driven lime utilized for basic purposes.
2. Class B ? Semi water driven lime utilized for lime concrete.

Proportioning of Lime Concrete

The extents of aggregate to lime mortar will be finished by volume. For the most part, lime is set up by mixing 100 pieces of 40 mm ostensible size evaluated stone aggregate, rock, or block aggregate as determined and 40 pieces of lime mortar of the predefined mix.

Mixing of Lime Concrete

Lime concrete will be mixed in a mechanical mixer. In excellent conditions, hand mixing will be permitted. Prior to mixing, block aggregate will be all around doused with water for a base time of 24 hours, and stone aggregate or rock will be washed with water to expel soil, dust or some other outside materials.

1. Machine Mixing: Mixing will be finished by pouring the deliberate amount of coarse aggregate and wet ground mortar in the mixer's drum while it is rotating.

The amount of materials stacked in the drum will not surpass the evaluated limit of the mixer.

The water will be added bit by bit up to the necessary amount, and the wet mixing of a clump will be proceeded for at any rate two minutes in the drum till concrete of uniform shading with consistently dispersed materials and consistency is obtained.

The consistency of the lime concrete will be to such an extent that the mortar doesn't will in general separate from the coarse aggregate.

On the off chance that there is isolation subsequent to emptying from the mixer, the concrete ought to be expelled.

The whole bunch of concrete will be released before the materials for the new clump are filled the drum.

Before suspending the work, the mixer will be cleaned by rotating the drum with a lot of water each time.

2. Hand Mixing: At the point when hand mixing is explicitly allowed, it will be done on a spotless and watertight stone work foundation of adequate size to give sufficient mixing space. The predefined wet lime mortar will be laid on the highest point of the aggregate.

Turning will be done over and again with the expansion of the essential amount of water until a uniform mix of required consistency is acquired. The consistency of the lime concrete will be to such an extent that the mortar will not in general separate from the coarse aggregate.

Setting and Compaction

The lime concrete will be laid in layers while it is new. Each layer of the lime concrete will be completely smashed and united before the succeeding layer is set. Solidified thickness of each layer will not surpass 15 cm. Joints where essential will be stumbled in various layers except if in any case indicated.

Smashing will be finished by substantial iron rammers of 4.5 kg to 5.5 kg and the territory of the rammer will not be more than 300 sq. cm. Smashing will be proceeded till a skin of mortar covers the outside of the laid lime concrete totally.

Concrete laid on a specific day will be merged completely around the same time before the work is halted. Newly laid concrete will be shielded from downpours by appropriate covers.

Curing of Lime Concrete

When the concrete has started to solidify, i.e., around 24 hours after its setting and compaction, the curing will be finished by keeping the concrete sodden with clammy gunny packs, sand, or some other technique for a base time of 7 days.